Behind Schedule – Ahead on Excuses Crewneck Sweatshirt

Behind Schedule – Ahead on Excuses Crewneck Sweatshirt

S / Dark Heather
$35.99
Skip to product information
Behind Schedule – Ahead on Excuses Crewneck Sweatshirt

Behind Schedule – Ahead on Excuses Crewneck Sweatshirt

$35.99
Shipping calculated at checkout.

Printed to order. Production usually takes 2–7 business days, plus shipping time. Shipping details.

Size
Color

Behind schedule. Ahead on excuses.

For every trailer meeting where the deadline slips and nobody owns it. The Behind Schedule artwork captures the classic “not my fault” debate on a Gildan® 18000 crewneck sweatshirt.

• 50% cotton / 50% polyester

• Medium-heavy fabric: 8.0 oz/yd²

• Classic unisex fit

• Ribbed collar, cuffs, and waistband

• Front graphic with a plain back

• Made to order

Fit: Check the size chart in the product photos and compare it with a sweatshirt you already own.

Care: Machine wash cold. Tumble dry on low heat. Do not iron or dry clean.

Off The Prints — jobsite humor from the trailer to the porta-john.



Product information: Gildan 18000, two year warranty in the EU and Northern Ireland

Warnings, Hazard: For adults

Care instructions: Machine wash: cold (max 30C or 90F), Non-chlorine: bleach as needed, Tumble dry: low heat, Do not iron, Do not dryclean

You may also like