Behind Schedule – Ahead on Excuses Crewneck Sweatshirt
Printed to order. Production usually takes 2–7 business days, plus shipping time. Shipping details.
Behind schedule. Ahead on excuses.
For every trailer meeting where the deadline slips and nobody owns it. The Behind Schedule artwork captures the classic “not my fault” debate on a Gildan® 18000 crewneck sweatshirt.
• 50% cotton / 50% polyester
• Medium-heavy fabric: 8.0 oz/yd²
• Classic unisex fit
• Ribbed collar, cuffs, and waistband
• Front graphic with a plain back
• Made to order
Fit: Check the size chart in the product photos and compare it with a sweatshirt you already own.
Care: Machine wash cold. Tumble dry on low heat. Do not iron or dry clean.
Off The Prints — jobsite humor from the trailer to the porta-john.
Product information: Gildan 18000, two year warranty in the EU and Northern Ireland
Warnings, Hazard: For adults
Care instructions: Machine wash: cold (max 30C or 90F), Non-chlorine: bleach as needed, Tumble dry: low heat, Do not iron, Do not dryclean