Behind Schedule – Ahead on Excuses Pullover Hoodie
Printed to order. Production usually takes 2–7 business days, plus shipping time. Shipping details.
Behind schedule. Ahead on excuses.
For every trailer meeting where the deadline slips and nobody owns it. The Behind Schedule artwork captures the classic “not my fault” debate on a Gildan® 18500 pullover hoodie.
• 50% cotton / 50% polyester
• Medium-heavy fabric: 8.0 oz/yd²
• Classic unisex fit for adults
• Drawstring hood and front pouch pocket
• Ribbed cuffs and waistband
• Small cream Off The Prints logo on the left chest and a large graphic on the back
• Made to order
Fit: Check the size chart in the product photos and compare it with a hoodie you already own.
Care: Machine wash cold. Tumble dry on low heat. Do not iron or dry clean.
Off The Prints — jobsite humor, off the clock.